I'm on call this weekend. That makes it a good day to do some knitting and spinning. I have to be within 20 minutes response time to the hospital, so I don't go very far.
I've got 8 blocks done on the Rambling Rows afghan. It's going to be a pretty snuggly afghan, with some heft to it. Perfect for the camper! I also think it will be good to work on this fall/winter - it'll keep my lap quite warm while I work on it.
At the rate the afghan is going, I need to get some more of the darkest fleece spun up. Maybe today?
I cast on for Paul's Cobblestone pullover on Thursday. I've got about 5 inches done on my swatch/sleeve. I don't really like to swatch, so I always start with a sleeve. I can block it, and if I don't like it, I can rip it back without too much discomfort.
1 comment:
I'm lovin' both your new projects. I wish my DH was a sweater wearing guy, so I could knit him the same sweater. I loved it, too.
Post a Comment